COR Essentials · Acquisition Package Builder · Build 3.1.2-RECOVERY

Acquisition Workspace

Define the mission need, structure requirements, discover the appropriate work breakdown, and preserve traceability for downstream acquisition products.

DEV application · Synthetic, sanitized, or non-sensitive acquisition data only
No acquisition selected Create a new acquisition or open a saved record.

Step 1 — Acquisition Context

Create or update the shared parent record for this acquisition.

Step 2 — Agency / DARPA Context

Capture planning context without implying that a final instrument has been determined.

DARPA Acquisition Profile

Step 3 — Mission Need Discovery

Define the problem and required Government outcome before decomposing requirements into work.

Mission Need Summary

Step 4 — Requirement Discovery

Translate the Mission Need into distinct Government requirements. COR Essentials uses qualifying questions to prevent the requirement from becoming a premature preferred solution.

A. What must the Government obtain or accomplish?

Identify distinct outcomes, capabilities, services, products, or results. Use one requirement per line.

B. What form should the requirement take?

Select all that describe the nature of the requirement.

C. What must be measurable or verifiable?

Capture technical metrics, performance outcomes, acceptance criteria, demonstrations, or other evidence of success. One item per line.

D. What Government boundaries or responsibilities matter?

Identify Government-furnished information/equipment, Government dependencies, security/access boundaries, or Government-retained responsibilities.

E. What should be explicitly excluded?

Identify known exclusions or scope boundaries to reduce ambiguity and later cost growth.

Draft Requirements

Requirement Qualification

Generate a qualification card for each draft requirement. Qualify each requirement independently before COR Essentials allows the requirement set to drive WBS Discovery.

Traceability rule: each requirement should preserve its own type, completion evidence, Government dependency, contractor responsibility, constraints, exclusions, deliverables, assumptions, and risks.

Step 5 — WBS / Task Discovery

Determine how the work is naturally organized before assigning resources and costs.

A. How is this effort naturally organized?

Select all structures that apply. COR Essentials will use these to create an initial work hierarchy.

B. What major bodies of work are required?

Enter one major work element per line. For DARPA R&D, these may be technical areas, research thrusts, phases, experiments, prototype activities, test events, or transition activities.

C. What demonstrates completion?

Enter major milestones or deliverables, one per line.

D. Are there important dependencies?

Describe sequencing or prerequisite relationships that could affect schedule or cost.

Recommended Structure

Complete the discovery questions to generate a recommended structure.

Step 6 — Requirement Structure Review

Review the requirement-to-work relationship before later resource estimating begins.

Requirements

Initial WBS / Work Structure

Structure Quality Check

Requirement CoverageNot assessed
Work StructureNot assessed
TraceabilityNot assessed
Semantic AlignmentNot assessed

Primary + Supporting Requirement Traceability

COR Essentials first compares each work element against the actual requirement statements to identify the strongest primary relationship, then identifies plausible supporting requirements. Recommendations remain advisory until explicitly applied.

Governance rule: one primary requirement identifies the principal requirement served by the work element. Supporting requirements capture legitimate cross-cutting relationships without forcing an artificial one-to-one WBS mapping.

Step 7 — Resource Discovery / IGCE Foundation

Define the labor and non-labor resources required to perform each validated WBS element before assigning rates or calculating costs. Build 3.1 preserves the frozen Build 2 requirement-to-WBS traceability baseline and creates the resource-quantity foundation for later Cost Discovery and IGCE assembly.

Governance rule: resource recommendations and quantities remain human-controlled. Build 3.1 captures what is required, how much is required, and why. Dollar rates, indirects, escalation, and Government Estimate calculations are intentionally deferred to Build 3.2.

WBS-Linked Resource Discovery

For each validated work element, define labor mix, non-labor resources, Government-furnished dependencies, assumptions, and the quantity Basis of Estimate. Add as many labor or non-labor rows as the work requires.

Resource Discovery QA

WBS Elements0
Resource Defined0 / 0
Labor Resources0
Non-Labor Resources0
BOE Coverage0%
Ready for Costing0 / 0
Traceability GateProtected
Build 3.2Locked

Diagnostic — Save Resource Discovery Click Path

This inspector does not change acquisition data. Click Save Resource Discovery once, then review which event stages actually fired.

Click Save Resource Discovery to run this diagnostic.

Step 8 — Cost Discovery

Build 3.2.6 Cost Discovery QA validates the complete Cost Discovery chain: Step 7 resource linkage, labor and non-labor pricing, direct-cost roll-up, assumptions, indirects, calculation integrity, evidence completeness, persistence, and regression protection.

Human-controlled estimating:
COR Essentials will calculate from the hours and hourly rates you approve. It will not invent labor rates or represent a calculated amount as a Government determination.
SchemaNot initialized
StatusNot initialized
Labor Resources Linked0
Saved Labor Cost Records0
Priced Labor Records0
Labor Estimated Cost$0.00
Non-Labor Cost Records0
Roll-Up EngineActive

Labor Cost Discovery

Each row remains linked to its Step 7 resource through the stable Resource ID. Step 7 resource definitions are not rewritten by this screen.

Non-Labor Cost Discovery

Build 3.2.3 introduces the deferred Description capability here, adds user-supplied unit pricing and price-source evidence, and calculates transparent extended non-labor cost without rewriting the Step 7 resource definition.

Cost Roll-Up

Build 3.2.4 aggregates the validated Step 8 labor and non-labor cost records into WBS-level and acquisition-level direct-cost totals. Underlying cost records and Step 7 resource definitions are not rewritten.

Cost Assumptions & Indirects

Build 3.2.5 captures user-supplied cost assumptions and indirect rates with explicit source evidence and application bases. COR Essentials calculates from the rates you approve; it does not invent indirect rates.

Indirect Rates

Cost Discovery QA

Build 3.2.6 independently evaluates Cost Discovery completeness and calculation integrity. QA reports findings only; it does not silently modify Step 7 resources, cost records, rate evidence, assumptions, or indirects.

Overall ReadinessNot assessed
QA Checks0
Warnings0
Failures0
Run Cost Discovery QA to evaluate the currently persisted acquisition.

Step 9 — BOE Analysis

Build 3.3.2 extends the persisted BOE foundation with evidence and estimating-method analysis. It evaluates frozen Step 7 and Build 3.2 source records by WBS without rewriting resource, cost, source-evidence, assumption, indirect, or traceability data.

Analysis boundary: BOE Analysis may evaluate, organize, and explain persisted estimating evidence. It does not invent labor rates, quantities, vendor pricing, source evidence, Government determinations, or silently alter Build 3.2 costing records.
Build 3.2 ReadinessNot assessed
BOE SchemaNot initialized
WBS Elements Linked0
Cost Records Linked0

BOE Analysis Foundation

BOE Evidence & Method Analysis

Build 3.3.2 evaluates persisted pricing evidence, resource-quantity BOE support, estimating methodology, and calculation traceability for each WBS element. Analysis findings are stored separately from the frozen source records.

Analyzed WBS0
Supported0
Review0
Not Priced0
Analysis not yet run: initialize the BOE foundation first, then analyze the persisted evidence and estimating methods.

BOE Risk & Readiness QA

Build 3.3.3 converts persisted Build 3.3.2 results into a non-destructive WBS-level readiness assessment. It flags unresolved BOE findings and documents readiness for final IGCE assembly without inventing or rewriting source data.

Overall BOE ReadinessNot assessed
Ready WBS0
Review WBS0
Not Priced0
Readiness QA not yet run: complete Build 3.3.2 first.

Step 10 — IGCE Assembly

Build 3.4.1 creates the non-destructive IGCE Assembly Foundation from the frozen Build 3.3 Final readiness record. It establishes WBS-linked assembly records and summary status without rewriting Requirements, WBS, Step 7 resources, Step 8 costs, or Step 9 BOE analysis.

Assembly boundary: this layer references validated upstream information. NOT PRICED WBS elements remain explicitly unpriced; COR Essentials does not invent costs, redistribute priced work, or fabricate missing Government estimate judgments.
Assembly StatusNot initialized
WBS Assembly Records0
Ready for Priced Assembly0
Not Priced0
Blocking BOE Reviews0
Priced Direct Cost$0.00
Source BuildNot initialized
SchemaNot initialized
Assembly not yet initialized: Build 3.3 Final BOE Risk & Readiness QA must be READY first.

WBS Assembly Foundation

IGCE Cost Structure & Summary

Build 3.4.2 assembles the validated priced cost structure from frozen Step 8 source records and Build 3.4.1 WBS assembly dispositions. It preserves direct/indirect separation, identifies unpriced WBS elements, and reconciles the assembly back to authoritative source costs without rewriting them.

Labor$0.00
Non-Labor$0.00
Direct Cost$0.00
Indirect Cost$0.00
Estimated Cost incl. Indirects$0.00
Priced WBS0
Not Priced0
ReconciliationNot run
Cost structure not assembled: initialize Build 3.4.1 first.

BOE Narrative Assembly

Build 3.4.3 assembles validated Build 3.3 BOE evidence and Build 3.4.2 cost structure into a non-destructive WBS-level narrative package. It carries forward authoritative basis, method, cost, evidence, risk, and review notes without inventing missing Government rationale or rewriting upstream records.

Narrative StatusNot assembled
Narrative Ready0
Review0
Not Priced0
Narrative assembly locked: Build 3.4.2 must reconcile before BOE narrative assembly.

IGCE Review & Certification QA

Build 3.4.4 performs the final non-destructive control review before export. It verifies assembly integrity, authoritative cost reconciliation, BOE narrative support, evidence coverage, unpriced-WBS disclosure, mathematical integrity, and carried-forward review notes. It does not certify the IGCE or rewrite upstream records.

Overall DispositionNot run
QA Checks0
Pass0
Review0
Fail0
Priced WBS0
Not Priced0
Export GateLOCKED
Certification QA locked: Build 3.4.3 BOE Narrative Assembly must be ASSEMBLED first.

IGCE Export Package

Build 3.4.5 prepares a controlled, non-destructive export package from frozen Build 3.4.4 QA results. It snapshots the validated assembly, cost structure, BOE narrative, QA disposition, review notes, and priced/unpriced disclosures without certifying the IGCE or rewriting upstream records.

Package StatusNot prepared
Export GateLOCKED
Priced WBS0
Not Priced0
Direct Cost$0.00
Indirect Cost$0.00
Estimated Cost incl. Indirects$0.00
Review Notes0
Export package locked: Build 3.4.4 Export Gate must be OPEN first.

IGCE Export Rendering & Document Generation

Build 3.4.6 renders the frozen Build 3.4.5 export-package snapshot into controlled user-downloadable files. Rendering consumes the prepared package as its authority; it does not recalculate costs, change WBS dispositions, certify the IGCE, or rewrite upstream records.

Rendering StatusNot initialized
Source PackageNot available
Files Available0
CertificationNOT CERTIFIED
Rendering locked: Build 3.4.5 Export Package must be PREPARED first.

Export QA & End-to-End Regression

Build 3.4.7 independently validates the frozen Build 3.4.1–3.4.6 IGCE chain and the rendered HTML, CSV, and JSON export content. QA is read-only with respect to authoritative acquisition, resource, cost, BOE, assembly, certification, export-package, and rendering records.

Overall RegressionNot run
QA Checks0
Pass0
Fail0
Rendered Files Validated0
Priced WBS0
Not Priced0
Certification BoundaryNOT CERTIFIED
Regression QA locked: Build 3.4.6 Export Rendering must be INITIALIZED first.

Acquisition Library

Open a saved acquisition from corEssentials.acquisition.v1.

Production Release & Final Freeze

Build 3.4.8 closes the Build 3.4 IGCE production sequence by verifying the frozen Build 3.4.7 regression result and recording a non-destructive production-release baseline. It does not certify the IGCE, recalculate costs, or rewrite upstream records.

Release Status
Not released
Regression Authority
Build 3.4.7 — PASS required
Production Baseline
Not established
Certification Boundary
NOT CERTIFIED
Ready for final release: run Build 3.4.7 regression QA first. Production release requires 14/14 PASS.
No persisted Build 3.4.8 production-release record.